Tuesday, February 7, 2012
Yesterday we poured cement. In Thailand that means hauling with a bucket and finishing with a hand trowel. Finished the 25 foot sink except for the tile which I will do next week after the cement has dried. We finished installing the gutters. Getting close to finishing the project(s); this has never happened before.
Dennis has been really sick since Saturday. He thought he was better on Sunday, but really didn’t start recovery until today. He was able to walk into Pua for some Quiteou.
Dennis has been really sick since Saturday. He thought he was better on Sunday, but really didn’t start recovery until today. He was able to walk into Pua for some Quiteou.
Sunday, February 5, 2012
We went to church today at Ban Tha Wang Pha with the children and the families in this area. I love to hear the voices singing in Hmong. Actually, here they blend three languages that only the people in this province can understand.
Interesting night last night. Dennis got really sick, so we called Ajan Mak who took him to the local hospital emergency room. Dennis got to experience Thai medicine first-hand. The entire ER cost was about $10. It was food poisoning, so he is OK today, but for a while, he wasn’t sure.
Interesting night last night. Dennis got really sick, so we called Ajan Mak who took him to the local hospital emergency room. Dennis got to experience Thai medicine first-hand. The entire ER cost was about $10. It was food poisoning, so he is OK today, but for a while, he wasn’t sure.
Friday, February 3, 2012
I am writing this at 4:00am. Still jet-lagged.
This week we finished electric and indoor plumbing. JouLee has finished the outdoor sink so Dennis and I can start the tile next week. The gutters for both dorms will be installed next week.
As slow as things seem, we have only been on-site for a week.
Trying to get ready to go from 11 students to 40 students. Need four time as many beds, chairs, dishes, everything. I hope Ajan and handle this many kids. My main concern is that they need another person to help with the spiritual needs of the students.
This week we finished electric and indoor plumbing. JouLee has finished the outdoor sink so Dennis and I can start the tile next week. The gutters for both dorms will be installed next week.
As slow as things seem, we have only been on-site for a week.
Trying to get ready to go from 11 students to 40 students. Need four time as many beds, chairs, dishes, everything. I hope Ajan and handle this many kids. My main concern is that they need another person to help with the spiritual needs of the students.
Wednesday, February 1, 2012
Been a busy few days. Last Sunday we went to church in a small Hmong village. 180 families and only five families attended. It always seems strange to sing hymns like “Holy, Holy, Holy” and “How Great Thou Art”; American melody and Hmong words.
Monday and Tuesday we worked on walls and electric in the girls dorm. Tomorrow, Jowlee (a local builder and brother in Christ) will start to work on a sink. Yes, he will build a 25ft long concrete sink. Ten girls will be able to wash at the same time.
Other than mixing and hauling a lot of concrete and mortar, Dennis and I have been working on the electricity. Tomorrow we hope to finish the most of the plumbing.
Monday and Tuesday we worked on walls and electric in the girls dorm. Tomorrow, Jowlee (a local builder and brother in Christ) will start to work on a sink. Yes, he will build a 25ft long concrete sink. Ten girls will be able to wash at the same time.
Other than mixing and hauling a lot of concrete and mortar, Dennis and I have been working on the electricity. Tomorrow we hope to finish the most of the plumbing.